900 sq ft, 2 bed, 1 bath The Massachusetts maximum: a king bedroom for Billy, a second bedroom for a caregiver, and a bathroom John says he would take in his own house.
About three months Trees down in September, ground broken the first week of October, in before Christmas, right on the target Buz set.
Plymouth's first ADU The Myettes wanted to be first in town, and they were. This is the house that started the BuildX home tours.

“There's no one as good as BuildX. Truly.”

Pam Myette, Plymouth

“BuildX was hired by my In Laws to build the first ADU in Plymouth for my Autistic Brother In Law. They have always talked about adding some other dwelling on their property so they can keep family close to home. BuildX made those dreams come true. In just a few short months, the built a beautiful, accessible home for my brother in law to live in. It was amazing to see how quickly and efficiently they were able to get it up. Kevin Healey from BuildX was exceptional, and worked closely with the family to ensure everything was just right. TL Smith Excavator did a fantastic job and leveling the area and making the property look cohesive, like it was always there.

I highly recommend BuildX for any building needs!”

MVS L · Google review · Plymouth, MA
The Full Story

Why did the Myettes build an ADU in Plymouth?

Pam and John Myette's son Billy is in his mid twenties and autistic, and the question every parent in their position lives with is what happens later. The option on the table was a group home. John says Billy would never adapt to one. Pam says it was not something they wanted to explore. They wanted Billy to live as independently as he can, in the least restrictive setting there is, and they wanted it settled while they could still make it happen.

When Plymouth moved to allow ADUs, the Myettes called Buz, whom Pam had known for decades. They wanted to be the first in town, and they were. The house gives Billy his own home for the rest of his life, with a second bedroom for a caregiver, and it lets Pam and John plan a retirement instead of a worry. Their oldest son will move to the property eventually and look after his brother from next door.

“It is the best thing we've ever done in our life. He will have more of his life and we will have more of our life, and that is priceless.”

Pam Myette

How was the plan designed around Billy's needs?

The state cap is 900 square feet, so Buz laid out several footprints that fit it and the Myettes shaped one around what they needed. Two bedrooms were the requirement: one for Billy, one for whoever will stay overnight to watch over him. Big windows and nine foot ceilings were Buz's call, because a small house reads as a big space when the light gets in. The bathroom is oversized with a big shower and a lot of storage, and Pam says it is the room she would most like to have in her own house.

Pam's description of the process is that Buz keeps it manageable for the homeowner, and that everything is one step above what everyone else is getting. If they were unhappy with anything, they called Buz or Kevin and it was changed. When decisions were hard, they trusted the answer would be right, because half done is not in him.

What was construction like for the Myette family?

Kevin, the project manager, was on site every day and gave John a rundown each morning of what would happen. The trades flowed one in, one out, and each crew introduced themselves, said what they were doing, and asked where to park. John has friends who build houses, and they could not believe a house went up in three months. Pam is at the ADU constantly. She says she loves that house more than her own.

How long did the Plymouth ADU take to build?

The first ground broken in September was only to take the trees down. Real construction started the first week of October, and the family was in before Christmas, which was the target Buz set. John puts the actual build at eight to ten weeks. It was an aggressive schedule and they hit it.

Does 900 square feet feel small?

Pam loves every room and cannot name one she dislikes. The king-size bedroom, the big windows and the nine foot ceilings are the things she and John mention first. John's favorite is the bathroom, big enough that visitors comment on it. What looks small on paper does not feel it inside, and that was the point of the design.

What changed once the ADU was finished?

The constant worry is gone. Pam says it is a peace she never thought she could have. John says they no longer carry the question of what the future brings, because they built it. The house also became the first BuildX home tour: more than 300 families came through over five weekends, and the stories Buz heard on those weekends are what turned ADUs from one favor for a friend into the company's whole focus.

Can an ADU be a forever home for a child with special needs?

Yes, and this is the house that proved it for Plymouth. Pam's message to every parent of a special needs child is to figure out a way to make it happen, because the peace it brings is not something a group home or a waiting list can give you. She adds that there is grant money available to families in this situation and that Buz handled the paperwork. If this is your family's question, ask it on the first call.

More from the family

Why This Family Built an ADU for Their Autistic Son: Plymouths 1st ADU
Pam Myette on being forever parents, the details Buz builds in that nobody sees, and the peace the house brought.
Plymouth's First In-Law Suite: Homeowner Testimonial: BuildX
A one minute testimonial from Pam and John: the plan for Billy, the kitchen, and the bathroom.

Thinking about an ADU in Plymouth?

This home went from first shovel to finished in the town where you are thinking of building yours. Start with Plymouth ADU rules, costs and permits, then see what an ADU really costs in Massachusetts.

Read the full Myette family story for the long-form version, in the family's own words.

Every project starts the way this one did: a conversation about what you actually need. No pressure, either way.

Meet the builder

Buz Artiano, Owner of BuildX

Buz Artiano

"My name is Buz Artiano, owner of BuildX. At BuildX we're more than a home builder. While building is what we do, the relationships that are created in the process are what drives our passion to transform your dream into a reality. That is why we strive to give a first-class experience to our clients by listening to their vision and then building their trust with a custom home design that matches their taste and lifestyle."