Carver & Hanover, MA | (781) 627-7000
ADU HOME TOUR IN COHASSET -- 10 Quonahassit Trail. 900 SF, 1 Bed, 1 Bath. Sept 12 & 13 and Sept 19 & 20, 11:00 AM - 1:00 PM. No appointment needed. Just Build Baby! ADU HOME TOUR IN COHASSET -- 10 Quonahassit Trail. 900 SF, 1 Bed, 1 Bath. Sept 12 & 13 and Sept 19 & 20, 11:00 AM - 1:00 PM. No appointment needed. Just Build Baby!

How to Get a Septic Variance from Your Board of Health

When we talk to people who are thinking about building an ADU, we hear this a lot. "My system works perfectly, but the town says I need a full replacement." The septic system that passed Title V inspection last year now all of a sudden has to have a $45,000 upgrade the second that you even mention adding an ADU to your property. It feels unfair, that's because a lot of time it is!

At BuildX, we have been through countless variance requests for ADUs in Massachusetts. We work with civil engineers who specialize in Title V compliance and Board of Health approvals. Our engineering partner, Kevin Grady of Grady Consulting, has turned in hundreds of variance requests in over 50 towns in Massachusetts. The relationship with the Board of Health really matters, and we've got the people and experience to make sure everything is able to move forward quickly.

The variance process can decide whether you need a simple $3,000 connection or a full $45,000 rebuild. We understand that this item alone can be the deciding factor in whether you can afford to build the ADU or not. The septic system is the wild card in the ADU process, and understanding how to request a variance helps gives you a bit more control.

Quick Answer: A septic variance allows the Board of Health to approve your ADU connection without having to replace the entire system. The decision is 100% up to the local board. You will need an engineer's letter with clear justification, septic pumping records, and inspection history. That whole process usually takes about four to eight weeks. If you get approved, it can save you $20,000 to $45,000 over replacing your whole system. Outcomes can be different, just depending on your town, so understanding your board's attitude before applying improves your chances.

What Does the Board of Health Actually Decide?

The variance is decided 100% by the local Board of Health. You apply, write them a letter, and explain why they should grant it. If the system is functioning and safe, boards should help you out. But just because we think they should doesn't always mean they will.

The Department of Environmental Protection (DEP) sets statewide Title V regulations, but it's up to the local Board of Health to interpret and enforce them. That means there's a lot of town-by-town variation. Some boards are very supportive of ADU development, but others not so much. It's good to know how your board feels about ADUs before you apply, it helps you when making your request.

Board of Health files are all public record. You can go do your own research and see how other people's requests have been decided in your town. If there are a lot of approvals in the past, that sort of sets the standard. If the board granted one for similar circumstances before, it's likely yours will be approved as well.

Which Types of Variances Can You Request?

Several variance types apply to ADU connections. Each one is for different site conditions and has different approval rates based on our experience in Massachusetts.

Variance TypeWhat It MeansWhen It Works BestTypical Success
Single-Compartment TankKeep existing single tank instead of adding second compartmentSystem is in good condition and not near wells or water40% to 60%
Existing Pits/CesspoolsContinue using pre-1995 leaching pitsUphill sites with dry sandy soils10% to 30%
Setback ReductionsAllow closer proximity to wells, property lines, or foundationsPhysical constraints limit options on site60% to 80%
Groundwater SeparationReduce required separation (example: 5 feet to 4 feet)Excellent percolation; demonstrated safety record50% to 70%

Groundwater separation requirements depend on the soil perc rates. If the perc test was two minutes per inch or faster, you have to have 5 feet separation. Slower draining soils only need four feet of groundwater separation. Details like this are important when deciding whether a variance request is even necessary.

What Makes a Variance Letter Work?

The variance letter has to show three things. A functioning system, environmental safety, and hardship. Your engineer provides the proof of a working system, then your documents showing your pumping proves the history. Your hardship argument needs to explain why a full replacement would make the ADU financially impossible for you.

System Status Documentation

Environmental Safety Evidence

Financial Hardship Statement

This is a statement saying that to do a complete septic system replacement at a cost of $35,000 to $45,000 would make the ADU too costly to even be possible. You're not arguing against any of the regulations, but are just giving an honest statement about whether you can afford the project or not.

Engineering Support

Your engineer evaluates the system and will let you know if it can safely handle the addition of an ADU. The engineer's letter carries a lot of weight because it is based on their professional liability. When an engineer stakes their reputation on something, the board members will listen better.

What Happens at the Board of Health Hearing?

The hearing is your chance to present your case to the decision-makers. You need to be well prepared for this if you want the best chance of approval.

Actions That Increase Approval Likelihood

Actions That Decrease Approval Likelihood

How Does Your Town's Attitude Affect Approval?

Board of Health attitudes can differ a lot from town to town. Understanding your town's feelings on the subject of ADUs can help with how you decide to present your variance request.

Town AttitudeCharacteristicsSuccess RateBest Strategy
ADU-FriendlyIt supports housing development; interprets regulations flexibly70% to 90%You should emphasize housing need and community benefit
By-the-BookIt follows DEP strictly; consistent decisions40% to 60%Make sure your documentation is perfect and all technical issues follow the regulations
Environmental FocusWatershed protection is a priority; issues cautious approvals20% to 40%Make sure you emphasize environmental safety arguments
Case-by-CaseThere is no clear pattern; individual personalities matter30% to 70%Do research on the individual board members

What Is the Variance Timeline?

The timeline for getting a variance is somewhere between six to eight weeks from prep to a final decision. For each week there are certain tasks you must complete before you can move forward.

  1. Week 1, Preparation: You should gather pumping records, the inspection reports, and site photos.
  2. Week 2, Engineering: You need to schedule a site review and receive a letter from your engineer.
  3. Week 3, Application: This week you should file a variance request with the local Board of Health which has all attachments.
  4. Weeks 4 and 5, Review: The health agent needs to review the application and might ask you for more information.
  5. Week 6, Hearing: During this time period you will present your case at a Board of Health meeting.
  6. Weeks 7 and 8, Decision: You should get written approval or denial, but be aware that the approval may include conditions.

What If Your Variance Gets Denied?

A Title V pass that you get at the time of sale is no guarantee that your project will meet all the regulations for the ADU expansion. Systems with raised parts and not very much groundwater separation will often get denied because they were approved under a different set of rules.

If your variance is denied, there's still several other ways we can do things.

Is a Variance Always the Right Approach?

Variances work the best for functioning systems that already have good recorded maintenance history and the perfect site conditions. If your current system has a history of failure, sits on less than perfect soils, or is too close to sensitive environmental areas, to request a variance could be a waste of both your time and money. If that is the case, you may want to come up with a plan and a budget for a whole new system from the beginning. That way you can plan all the costs for the full project accurately.

Some towns are very strict and usually deny variance requests. If your engineer has recent experience with your specific Board of Health and advises against requesting a variance, it's best to listen to him. The goal is to make sure we can build an ADU, not win an argument.

Ready to Evaluate Your Septic Variance Options?

Always try for the variance because the worst the board can say is no. And when it works, you could possibly save up to $20,000 to $45,000 and keep your ADU project going. So start by gathering your pumping records and inspection history, then contact an engineer who is experienced with your town's Board of Health.

For more information about septic systems and ADUs, read our complete septic series starting with How Do You Handle Septic Systems for ADUs at buildx.com.

Ready to Discuss Your Septic Situation?

We work with engineers who have relationships with Board of Health officials across Massachusetts and they can help you understand your variance likelihood before you put money and time into the application process.

Request a Free Consultation or call (781) 627-7000

See our work in person: buildx.com/adu-home-tour

Disclaimer: Every effort has been made to accurately convey Buz Artiano's answers based on live interviews and podcast episodes as of their original recording dates. However, pricing, timelines, materials, regulations, and other details may change over time. Please call our offices at (781) 627-7000 or schedule a Project Clarity Call before making any final decisions based on the information in this article.

Meet the builder

Buz Artiano, Owner of BuildX

Buz Artiano

"My name is Buz Artiano, owner of BuildX. At BuildX we're more than a home builder. While building is what we do, the relationships that are created in the process are what drives our passion to transform your dream into a reality. That is why we strive to give a first-class experience to our clients by listening to their vision and then building their trust with a custom home design that matches their taste and lifestyle."