BuildX · ADU Projects · Marshfield, Massachusetts

A 900 Square Foot Marshfield ADU, Built for Christina

A real accessory dwelling unit BuildX designed and built in the Copeland family's Marshfield backyard: two bedrooms, one bath, nine foot ceilings, every material chosen for their daughter's health, and construction finished in 79 days.

as told by Alice and Dean Copeland, Marshfield homeowners

Why We Built an ADU for Our Autoimmune Daughter
Alice and Dean Copeland walk through the finished ADU, from the first kitchen table meeting to move-in day.
900 sq ft, 2 bed, 1 bath The Massachusetts maximum, with a full kitchen and living space on one floor.
79 days of construction First shovel to finished home, against a 100 day commitment.
Health-first materials No particle board, minimized adhesives, mineral wool insulation, low-VOC paints, whole-house ERV.

“If you had to describe BuildX in three words? They really care.”

Alice Copeland, Marshfield

“We built a 900 sq. ft. ADU in Marshfield with BuildX, and the experience exceeded our expectations. This project was designed specifically to support our daughter, who has autoimmune issues, so attention to detail, cleanliness, and thoughtful design were critical. BuildX understood that from day one and optimized the space to be comfortable, safe, and functional for her long-term needs. Justin, our project manager, did an outstanding job keeping everything organized, clearly communicated, and on schedule. He made sure every detail was handled properly and that we always knew what was happening next. From design and permitting to construction, the entire process was transparent and professional. We’re incredibly grateful to the BuildX team for delivering a space that truly improves our family’s quality of life.”

Dean Copeland · Google review · Marshfield, MA
The Full Story

Why did the Copelands build an ADU in Marshfield?

Alice and Dean Copeland's daughter, Christina, was ready for her own home. She also lives with autoimmune conditions that make an ordinary home a real problem: unknown neighbors, unknown materials, and nobody close by if she needs help. The family looked at a condominium and thought about an apartment, and neither answered the actual question, which was how Christina could be independent and still be thirty feet from her parents.

An ADU in the backyard answered it exactly. As Alice put it, it is the way it is supposed to be: your kids grow up and move on. This one just moved somewhere she could watch being built from her window.

How was this ADU designed around off-gassing concerns?

The family raised it at the very first meeting: materials that off-gas were not going to work for Christina. Buz did not just agree and move on. He went and did his own research, then called back with options the Copelands had never heard of.

Particle board came out of the plan entirely. Adhesives were minimized throughout the build, with natural pine boards used to cut off-gassing further. The insulation is mineral wool, resistant to mold and mildew. The paints are low-VOC. The unit was also engineered with a whole-house ERV system to keep fresh air moving continuously rather than trapping it.

“When we put your daughter in this home, we don't want to find out two years down the road that she can't live in it.”

Buz Artiano, as Alice remembers that first meeting

That sentence is why the Copelands hired BuildX. Most builders, Alice says, want to get the job done, make their money, and move on. This one was researching insulation for a young woman he had just met.

What was construction like for the Copeland family?

Somebody was on site at seven o'clock every working day. Justin, the project manager, gave the family daily updates on who would be there and introduced the crews as they arrived; if he was not on site, he called. The subcontractors were polite, fast, and cleaned up after themselves.

Alice works in the industry and hears from customers who have not seen their builder in two weeks. Here, she watched the hole get dug, the concrete poured, and the framing go up, with visible progress every single day. “She gets to look out the window and see it being built,” Dean says of Christina, “and say, that's my house being built.”

How long did the Marshfield ADU take to build?

Buz committed to 100 days of construction at that first kitchen table meeting. The build came in under it, first shovel to finished home, in the year it was started. The commitment was the ceiling, not the estimate.

Does 900 square feet feel small?

Not in this house. Nine foot ceilings and taller windows fill the rooms with light, and the reaction from people touring it became a refrain: “I can't believe this is 900 square feet.”

What changed once Christina moved in?

Christina lives there now. She pays her own bills, takes out her own trash, and controls her own space, in a home where every material was chosen for her. “Everything about this ADU, the low VOC, the low adhesives, the off-gassing, everything is built for her,” Dean says. “She's had no issues since she's moved in.”

Alice and Dean got something back too: their own independence as a couple, with their daughter still right there. On the last day of the open house, Alice hugged Buz, because it felt like a friend was moving on to his next project. Her review of the company runs two words: “Phenomenal company.”

Can an ADU be built for someone with health or chemical sensitivities?

Yes, and this is the build that proves it. It was engineered around off-gassing from the first meeting rather than adjusted for it later: no particle board, minimized adhesives, natural pine boards, mineral wool insulation, low-VOC paints and a whole-house ERV, all chosen around one resident's specific medical needs. If someone in your family has autoimmune, respiratory or chemical sensitivities, raise it on the first call. It changes the specification, not the schedule.

More from the family

A Home Built for Health: An ADU Designed for Our Daughter's Needs
On the health-first build: the materials, the research, and why it mattered.
Building Independence for Our Daughter: The Copeland Family ADU Story
On independence: for Christina, and for her parents.

Thinking about an ADU in Marshfield?

This home went from first shovel to finished in the town where you are thinking of building yours. Start with Marshfield ADU rules, costs and permits, then see what an ADU really costs in Massachusetts.

Read the full Copeland family story for the long-form version, in the family's own words.

Every project starts the way this one did: a conversation about what you actually need. No pressure, either way.

Meet the builder

Buz Artiano, Owner of BuildX

Buz Artiano

"My name is Buz Artiano, owner of BuildX. At BuildX we're more than a home builder. While building is what we do, the relationships that are created in the process are what drives our passion to transform your dream into a reality. That is why we strive to give a first-class experience to our clients by listening to their vision and then building their trust with a custom home design that matches their taste and lifestyle."