ADU Rules in Marion, MA
Yes. Marion allows an ADU up to 1,200 sq ft by right, with a building permit only. Marion's own bylaw, Section 230-8.14, adopted at the May 2025 Annual Town Meeting, allows a detached or attached ADU up to 1,200 sq ft or half the size of the main house, whichever is smaller. No hearing, no ZBA. The friction is not whether ADUs are allowed. It is Buzzards Bay watershed protection, sewer or septic status, and coastal flood zones.
Call BuildX: (781) 627-7000
Marion allows ADUs up to 1,200 sq ft by right
Section 230-8.14 · Adopted at the May 2025 Annual Town Meeting (Article 33)Marion adopted its own ADU bylaw, Section 230-8.14, at the May 2025 Annual Town Meeting (Article 33) [Section 230-8.14] [Town Meeting]. A detached or attached ADU is allowed by right, with a building permit only, up to 1,200 sq ft or half the gross floor area of the main house, whichever is smaller. There is no hearing and no ZBA review. That goes well past the state-law floor of 900 sq ft [760 CMR 71], and it makes Marion one of the best towns on the South Coast for a full-size ADU.
Can I build an ADU in Marion, MA?
Yes. Marion allows a detached or attached ADU by right, with a building permit only, up to 1,200 sq ft or half the gross floor area of the main house, whichever is smaller. The rule is Zoning Bylaw Section 230-8.14, adopted at the May 2025 Annual Town Meeting. It applies in Residence A through E, General Business, Marine Business, Limited Business, and Limited Industrial.
Show the size rule, districts, and other conditions
The 50% rule. The ADU can be up to 1,200 sq ft, but never more than half the gross floor area of the main house. A 2,400 sq ft house gets the full 1,200 sq ft. A 2,000 sq ft house caps the ADU at 1,000 sq ft [Section 230-8.14].
- Size: Up to 1,200 sq ft or half the main house, whichever is smaller. By right. [Section 230-8.14]
- Districts: Residence A through E, General Business, Marine Business, Limited Business, and Limited Industrial. [Section 230-8.14]
- Permit: Building permit only. No hearing, no ZBA review.
- Above the cap: There is no special permit path to go larger. Anything over the cap would need a variance.
Other conditions in the bylaw. One ADU per lot. The ADU cannot be sold separately from the main house. No short-term rentals: leases must be at least 31 days. One dedicated off-street parking space, unless the ZBA waives it by special permit. Title 5 applies on septic, and in a sewer or water service area the ADU must connect, subject to DPW capacity review [Section 230-8.14].
The old accessory apartment bylaw is gone. The same Town Meeting repealed Marion's old accessory apartment bylaw, Section 230-8.6 (Article 34) [Town Meeting]. Confirm how the bylaw applies to your parcel with the Marion Building Department at (508) 748-3516.
Garage conversion ADU
A garage conversion works under Section 230-8.14, which allows both detached and attached ADUs by right. A detached garage becomes a detached ADU; an attached garage converts into an attached ADU. The same size cap applies: up to 1,200 sq ft or half the main house, whichever is smaller.
- If the garage is detached: A detached ADU, by right with a building permit [Section 230-8.14]
- If the garage is attached to the house: An attached ADU, by right with a building permit
- Best for: Properties with a structurally sound existing garage; reuse of foundation, walls, and roof; faster than ground-up construction
- Watch for: Foundation adequacy, insulation upgrades, separate-entrance and bathroom plumbing, sewer or septic capacity, and any Buzzards Bay watershed or flood-zone constraints on the parcel
Marion ADU Rules at a Glance
The six things most homeowners ask first. Tap "View all rule details" for the complete data set.
View all Marion rule details
- ADUs allowed (state law): By-right, 900 sq ft or less, in zones permitting single-family dwellings [760 CMR 71]
- Local bylaw: Section 230-8.14, adopted at the May 2025 Annual Town Meeting (Article 33) [Section 230-8.14] [Town Meeting]
- Max size: 1,200 sq ft or half the main house's gross floor area, whichever is smaller. By right. [Section 230-8.14]
- Districts: Residence A, B, C, D, E, plus General Business, Marine Business, Limited Business, and Limited Industrial [Section 230-8.14]
- Short-term rentals: Not allowed. 31-day minimum lease. [Section 230-8.14]
- Parking: One dedicated off-street space, unless waived by ZBA special permit [Section 230-8.14]
- ADU types: Detached or attached. One ADU per lot; it cannot be sold separately from the main house. [Section 230-8.14]
- Owner-occupancy: Preempted by 760 CMR 71.00 for protected-use ADUs (900 sq ft or less) [760 CMR 71]
- Sewer status: Mixed. Substantial public sewer in Marion Village; outlying areas on septic
- Sewer connection: Required for ADUs in sewered areas, subject to DPW capacity review [Section 230-8.14] [DPW]
- Aquifer overlay: Aquifer and Zone II wellhead protection overlays apply [MassGIS]
- Coastal flood zones: Sippican Harbor, Buzzards Bay coastline, Mattapoisett Harbor frontage [FEMA]
- Watershed: Buzzards Bay watershed; Marion Town House hosts the BBAC mailing address [BBAC]
- Dimensional standards: Per the Marion Zoning Bylaw. Confirm exact lot, setback, and height values with the Marion Planning Department.
- Permitting: Online Permitting via the town website. Confirm the platform with the Building Department.
Why BuildX Knows Marion ADUs
Marion is part of BuildX's South Shore home territory. We work Marion every month and know the Buzzards Bay watershed, sewer, flood-zone, and coastal-village constraints that drive your project.
Home Territory
Marion is BuildX home territory. We are your neighbors, not a regional contractor. We work the South Coast every month, so we know Marion's coastal parcels, sewer or septic status, flood-zone issues, and watershed questions firsthand.
See One in Person
Walk through a real, finished BuildX ADU before you sign anything. Private showings are available by appointment.
Day 1 Property Review
Before quoting, we check zoning, sewer or septic, FEMA flood zone, Buzzards Bay watershed, wetlands, and aquifer overlay status.
We Work Marion Every Month
Marion is part of BuildX's South Shore home territory. We work Marion every month designing ADUs for your neighbors. We bid Marion ADU projects regularly as part of our standard business operations. We don't have a Marion build on the board yet. Yours could be the first.
What we've built nearby: the Callinan ADU in Wareham, which borders Marion to the north and west, the Bradford ADU in Mattapoisett, just to the east, and the Desousa ADU in Acushnet, the next town over. And across the South Shore and South Coast, BuildX has an active pipeline of ADUs in two dozen towns.
Real families. Real builds. Real ADUs on the South Shore. See more BuildX ADU builds →
What Can Complicate a Marion ADU?
Marion is a small, affluent coastal town on Buzzards Bay. Your parcel's water-quality, sewer, and flood overlays, not the bylaw, are usually what move project cost and timeline. The factors that come up most often:
Do I need septic approval for a Marion ADU? Septic
Likely affects you if: your parcel is outside Marion Village or any other sewered area and relies on a private septic system.
Yes if your parcel is on private septic. Marion has substantial public sewer in Marion Village (the central village), but outlying areas rely on private septic. Adding a bedroom adds wastewater design flow, so a Title 5 inspection and capacity check are typically required before an ADU permit is approved [Title 5].
Cost impact: $30,000 to $60,000 for a Title 5 capacity check plus possible system replacement when an older system cannot carry an additional ADU bedroom.
Coastal nitrogen consideration: Marion is not formally a Cape Cod town, but it shares nitrogen-sensitive coastal characteristics with Cape towns, which can drive stricter septic standards near the bay. Confirm with the Marion Board of Health [Board of Health] whether any nitrogen-sensitive area rules apply to your address [Title 5].
If your parcel is in a sewered area, Section 230-8.14 requires connection to public sewer, subject to DPW review for capacity [Section 230-8.14] [DPW]. Confirm sewer availability by your specific address before design.
What flood-zone rules affect Marion ADUs? Coastal flood
Likely affects you if: your parcel is along Sippican Harbor, the Buzzards Bay coastline, Mattapoisett Harbor frontage, or any coastal or low-lying parcel mapped in a FEMA flood zone.
Marion has extensive Buzzards Bay coastal exposure. Significant FEMA flood zones run along Sippican Harbor, the Buzzards Bay coastline, and the Mattapoisett Harbor frontage on the eastern boundary [FEMA]. ADU projects on these parcels are different projects.
Cost premium: 15% to 25% on top of base ADU cost for elevation, breakaway walls, and engineer-stamped flood compliance.
Design requirements: FEMA-compliant elevation above base flood elevation, breakaway lower-level walls in V-zones, engineer-stamped structural design, flood-resistant materials, and utility elevation.
Coastal storm vulnerability is significant in Marion. Engineer-stamped flood compliance is non-negotiable on the permit side for coastal parcels.
How does Buzzards Bay watershed protection affect Marion ADUs?
Likely affects you if: your parcel is near the bay, a cove, or a tidal area, or relies on a septic system in a nitrogen-sensitive coastal area.
Buzzards Bay water quality is the dominant regional consideration in Marion. The Marion Town House serves as the mailing address for the Buzzards Bay Action Committee (BBAC), the regional water-quality coalition for the watershed [BBAC]. ADUs near the bay or in nitrogen-sensitive coastal areas face Title 5, local Board of Health, and watershed-protection considerations together.
Marion also has an active local Stormwater Management Bylaw under the federal MS4 Permit framework [Building Dept]. Any new construction may need stormwater design coordination. We pull the watershed map and the Board of Health requirements early so the design accounts for them from Day 1.
Do wetlands or conservation rules affect Marion ADUs?
Likely affects you if: your lot is within a wetland buffer, near a coastal resource area, a pond, a stream, or any mapped wetland.
Yes if your parcel falls within a wetland resource area buffer. The Marion Conservation Commission [Conservation] administers wetlands review under MGL c.131 §40 (the state Wetlands Protection Act) plus Marion's local wetlands bylaw [WPA]. Wetland filings are frequent for waterfront projects.
Adding an ADU near a wetland resource area triggers a Notice of Intent or Request for Determination filing. Plan on adding time to the schedule if your parcel falls within a buffer. Confirm the exact buffer distance with the Marion Conservation Commission.
Cost impact: +$5,000 to $15,000, plus 6 to 10 weeks of additional review for a waterfront or wetland-adjacent project.
How does the Marion aquifer overlay affect ADUs?
Likely affects you if: your parcel falls within an aquifer or Zone II wellhead protection overlay. Marion runs its own public water supply.
Marion has its own municipal water supply, and aquifer and Zone II wellhead protection overlays apply across parts of town [MassGIS]. ADU septic siting is reviewed more carefully inside these overlays, because adding a bedroom adds wastewater design flow and Zone II overlays limit how septic systems can be sited and sized.
A MassGIS overlay check on Day 1 tells you whether your parcel sits within an aquifer or wellhead protection zone. We pull this before quoting. In water-service areas, Section 230-8.14 requires connection to the public water system, subject to DPW review [Section 230-8.14].
Do scenic road and tree rules affect Marion ADUs?
Likely affects you if: your project requires a driveway change or tree removal along a designated scenic road.
Marion has scenic road designations, and tree-cutting along a scenic road requires review [Building Dept]. This is a Marion-specific consideration that matters for any project requiring a driveway change or tree removal. We coordinate this early so it does not surprise the schedule.
Marion's historic village character also shapes design. ADUs in and around Marion Village are expected to fit the historic, residential, modest scale of the village, with Tabor Academy and other historic resources nearby. We design to match the village context.
What Does a Marion ADU Cost?
A Marion ADU should not be priced from square footage alone. Two similar ADUs can price very differently depending on sewer or septic status, coastal flood elevation, watershed and conservation review, and how large an ADU your main house allows (up to 1,200 sq ft).
That is the full span of our 14 floor plans. Prices include the complete building package, foundation through move-in-ready finishes. Site work is priced separately after a lot evaluation.
Marion-specific cost premium factors
See full ADU pricing and floor plans. For a Marion-specific quote, call (781) 627-7000. We will not quote a Marion ADU until we know your sewer or septic status, Buzzards Bay watershed and flood-zone status, and how large your main house is, since it sets your ADU size cap.
How the Marion ADU Permit Process Works
A building permit is all most Marion ADUs need. No hearing, no ZBA review.
-
1
Parcel review
1 to 2 weeks
BuildX maps your parcel against zoning, sewer or septic, FEMA flood zone, Buzzards Bay watershed, wetlands, and aquifer overlay status before quoting. This step determines whether the rest of the timeline is straightforward or extended. MassGIS and parcel overlay checks happen on Day 1.
-
2
Building permit
Varies by completeness and town review queue
For an ADU within the size cap, submit a building permit application with a site plan and floor plan to the Marion Building Department through the town's Online Permitting system. In sewered areas, a DPW capacity review for the sewer or water connection is required per Section 230-8.14 [Section 230-8.14] [DPW].
-
3
Parking waiver (only if needed)
Add a public hearing cycle when triggered
The bylaw requires one dedicated off-street parking space for the ADU. If your lot cannot provide it, the ZBA can waive it by special permit, which adds a public hearing. Otherwise there is no hearing and no ZBA review [Section 230-8.14].
-
4
Overlay reviews (if triggered)
Add weeks when triggered
Title 5 septic review (MassDEP 310 CMR 15.000), Marion Conservation Commission filing for wetlands buffers (MGL c.131 §40 plus the local wetlands bylaw), Board of Health coordination for Buzzards Bay watershed and nitrogen-sensitive area concerns, FEMA flood compliance and engineer stamps for coastal parcels, and stormwater design under the MS4 Permit framework. These can run in parallel but can extend the critical path.
Construction inspections run through the Marion Building Department. Confirm the current permit process, turnaround, and Online Permitting platform at (508) 748-3516.
What Marion Zoning Districts Allow ADUs?
Marion's Section 230-8.14 allows ADUs by right in all five Residence districts (A through E) and, unusually, in four business and industrial districts as well. Exact dimensional standards (lot size, frontage, setbacks, height) are set by the Marion Zoning Bylaw. Confirm exact values with the Marion Planning Department for your specific parcel.
ADUs allowed in business and industrial districts (Marion-specific)
Section 230-8.14 allows ADUs by right in the General Business, Marine Business, Limited Business, and Limited Industrial districts, in addition to all five Residence districts. That is broader than most towns in our area, which allow ADUs only in residential districts. It can be useful if you own a residence in a mixed-use area or a Marine Business district property. Confirm how it applies to your specific parcel with the Planning Department [Section 230-8.14].
Residence A, B, C, D, E. The five residential districts.
- Min lot: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
- Min frontage: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
- Max coverage: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
- Max height: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
ADU rules: ADUs allowed by right in Residence A, B, C, D, and E, up to 1,200 sq ft or half the main house, whichever is smaller, with a building permit only [Section 230-8.14].
What this means for your ADU: The Residence districts are the standard ADU case in Marion. Sewer or septic status, coastal flood exposure, and watershed considerations usually drive the design more than the base zoning. Confirm your parcel's exact dimensional limits with the Planning Department before design.
General Business, Marine Business, Limited Business, Limited Industrial. Business districts that allow ADUs.
- Min lot: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
- Min frontage: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
- Max coverage: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
- Max height: Per the Marion Zoning Bylaw. Confirm with the Planning Department.
ADU rules: Section 230-8.14 allows ADUs by right in General Business, Marine Business, Limited Business, and Limited Industrial, in addition to the Residence districts. Marine Business reflects Marion's coastal, harbor-oriented character [Section 230-8.14].
What this means for your ADU: If you own a residence in a General Business or Marine Business area, the bylaw gives you an ADU pathway most towns do not offer. Whether your specific use and parcel qualify is a Planning Department determination. Confirm before you design.
Overlay Districts. Aquifer, watershed, floodplain, scenic roads.
Aquifer and Zone II wellhead protection overlays, the Buzzards Bay watershed, FEMA floodplain areas along the coast, and scenic road designations all overlay the base districts. Overlays modify, but do not prevent, ADU construction.
Overlay analysis happens on Day 1 with MassGIS layers [MassGIS]. We pull your parcel's overlays before quoting.
Source: Marion Zoning Bylaw Section 230-8.14, adopted at the May 2025 Annual Town Meeting (Article 33) [Section 230-8.14] [Town Meeting]. Confirm dimensional standards with the Marion Planning Department.
Sewer or Septic? Marion Is Mixed.
This is one of the biggest cost variables in any Marion ADU project. Marion has substantial public sewer in Marion Village (the central village). Outlying areas rely on private septic. Section 230-8.14 requires connection to public sewer for ADUs in sewered areas, subject to DPW capacity review.
Show Title 5, water utility, and connection details
- Water utility: Marion runs its own municipal water supply; aquifer and Zone II wellhead protection overlays apply [MassGIS]
- Septic upgrade cost: $30,000 to $60,000 typical for an outlying parcel needing a system upgrade
- Title 5 trigger: Adding a bedroom adds design flow, so Title 5 review is required on septic parcels [Title 5]
- Sewer connection: Required in sewered areas, subject to DPW capacity review per Section 230-8.14 [Section 230-8.14] [DPW]
- Coastal nitrogen: Nitrogen-sensitive coastal area standards may apply near the bay. Confirm with the Marion Board of Health [Title 5]
Marion Village is largely sewered. Most outlying neighborhoods are on septic. We do not quote a Marion ADU until we know which side of that line your parcel sits on. A Title 5 inspection answers this question for your specific property, and the DPW confirms sewer capacity in sewered areas.
Marion Is Organized Around Its Harbor and Village
Marion is a small coastal town built around Sippican Harbor and the historic Marion Village. The areas that come up most often in ADU planning have their own sewer status, flood-risk profile, and design context. A Marion Village ADU is a different project from a Buzzards Bay coastline ADU.
Marion ADU Feasibility by Area (At a Glance)
| Marion Area | Common ADU Issue | BuildX Note |
|---|---|---|
| Marion Village | Sewer, historic village character | Lower septic risk; design should fit the historic, modest village scale |
| Sippican Harbor area | Coastal flood exposure, possible Marine Business district | FEMA flood compliance and coastal premium drive design |
| Buzzards Bay coastline | Flood zones, nitrogen-sensitive septic | Watershed and Board of Health coordination matter early |
| Mattapoisett Harbor frontage | Coastal flood exposure on the eastern boundary | Elevation and FEMA flood rules may affect design |
| Outlying upland areas | Septic, larger lots, scenic roads | Title 5 capacity and any scenic-road tree review matter most |
Marion Village Sewer
The central historic village, with the Town House at 2 Spring Street and Tabor Academy nearby. Largely sewered, with lower septic risk. ADUs here are expected to fit the historic, residential, modest village scale.
Flood risk: Moderate near the harbor.
Sippican Harbor area Coastal flood
The central harbor and waterfront. Coastal exposure with FEMA flood zones, and possible Marine Business district frontage. Coastal premium applies.
Flood risk: High along the water.
Buzzards Bay coastline Septic Coastal flood
Multiple coves, beaches, and tidal areas. Coastal premium, FEMA flood zones, and nitrogen-sensitive area septic considerations near the bay.
Flood risk: High. Cost premium 15% to 25%.
Mattapoisett Harbor frontage Coastal flood
The eastern coastal boundary, shared with Mattapoisett. Coastal exposure and FEMA flood compliance.
Flood risk: High along the water.
Outlying upland areas Septic
Larger lots away from the coast, with private septic and reserve area. Some parcels sit along designated scenic roads where tree removal requires review.
Flood risk: Low.
What Marion's Building Commissioner Says
Marion's ADU bylaw came out of a public process, with the Building Commissioner on the record about why the old rules needed to change.
I personally think we should get rid of the old bylaw altogether because it doesn't allow rentals and it's only for family members, and I've been saying since I got here, "How do I regulate that?"
That is the posture behind Section 230-8.14 as adopted: align the local rules with state law, allow long-term rentals, and retire the old family-member-only accessory apartment rule, which the same Town Meeting repealed (Article 34) [Town Meeting]. Confirm how the bylaw applies to your parcel with the Marion Building Department at (508) 748-3516.
Marion Building Department
Marion Building Department
Marion uses the term "Town House" rather than "Town Hall," a historic Marion convention. The Building Department is at the Marion Town House. The Building Commissioner and Town Planner work together on ADU policy, so on an ADU question it helps to ask for either one when you call [Building Dept].
- AddressMarion Town House, 2 Spring Street, Marion, MA 02738
- Phone(508) 748-3516
- Fax(508) 748-3534
-
Hours
Monday8:00 AM to 4:30 PMTuesday8:00 AM to 4:30 PMWednesday8:00 AM to 4:30 PMThursday8:00 AM to 4:30 PMFriday8:00 AM to 3:30 PM
- Building CommissionerBob Grillo [Building Dept]
- Town PlannerDoug Guey-Lee [Sippican Week]
- Online permittingOnline Permitting via the town website. Confirm the platform with the Building Department.
- Building Departmentmarionma.gov/171/Building-Department
- ADU bylawSection 230-8.14, adopted May 2025 (Article 33). Ask the Town Clerk for the certified text.
- Town Clerk(508) 748-3502
Marion is a small, tightly-staffed town. For ADU questions, the Building Commissioner and Town Planner coordinate, so asking for either one when you call gets you to the right conversation.
Questions to ask when you call Marion
- Does my main house's gross floor area allow the full 1,200 sq ft ADU, or does the 50% rule cap it lower?
- Is my parcel in a sewered area, and is sewer connection required for the ADU?
- Will Title 5 review be required, and does my address sit in a nitrogen-sensitive coastal area?
- Is my parcel in a FEMA flood zone, an aquifer or wellhead overlay, or a wetland buffer?
- Is my property on or near a designated scenic road that would require tree-cutting review?
- Does my lot have room for the one dedicated off-street parking space, or will I need a ZBA waiver?
Explore Marion ADU Topics
Jump to deep-dive sections on this page.
Marion ADU FAQs
Can I build an ADU in Marion right now?
Yes. Marion allows a detached or attached ADU by right, with a building permit only, under Section 230-8.14, adopted at the May 2025 Annual Town Meeting. The ADU can be up to 1,200 sq ft or half the gross floor area of the main house, whichever is smaller. State law (760 CMR 71.00) protects ADUs up to 900 sq ft, but Marion's bylaw goes further.
How big can a Marion ADU be?
Up to 1,200 sq ft, or half the gross floor area of your main house, whichever is smaller. A 2,400 sq ft house allows the full 1,200 sq ft ADU; a 2,000 sq ft house caps it at 1,000 sq ft. There is no special permit to go bigger. Anything over the cap would need a variance.
Do I need a special permit for a Marion ADU?
No. An ADU within the size cap needs only a building permit, with no hearing and no ZBA review. The only special permit in the bylaw is a ZBA waiver of the one required off-street parking space. A floodplain or aquifer overlay can add its own review, as it would for any building.
Can I build an ADU in a Marion business district?
Yes. Section 230-8.14 allows ADUs by right in General Business, Marine Business, Limited Business, and Limited Industrial, as well as all five Residence districts. That is broader than most towns in our area. Confirm how it applies to your parcel with the Planning Department.
Can I Airbnb my Marion ADU?
No. Section 230-8.14 prohibits short-term rentals of the ADU: leases must be at least 31 days. Long-term rental is allowed, and the ADU cannot be sold separately from the main house.
Sewer or septic in Marion?
Depends on your parcel. Marion has substantial public sewer in Marion Village (the central village), while outlying areas rely on private septic. This is one of the biggest cost variables. A Title 5 capacity check plus possible system replacement adds $30,000 to $60,000 to a septic-served Marion ADU project. In sewered areas, Section 230-8.14 requires connection to public sewer, subject to DPW capacity review. Confirm sewer availability by your specific address.
What about Buzzards Bay water quality?
Watershed protection is a real consideration in Marion. The Marion Town House hosts the mailing address for the Buzzards Bay Action Committee, the regional water-quality coalition. ADUs near the bay or in nitrogen-sensitive coastal areas face Title 5, local Board of Health, and watershed considerations together, and stricter septic standards may apply near the water. We pull the watershed map and Board of Health requirements early.
What does a Marion ADU cost?
BuildX ADU pricing ranges from $284,301 to $525,861. That covers the complete building package, foundation through move-in-ready finishes; site work is priced separately after a lot evaluation. Marion-specific drivers move a project within that band: septic upgrades add $30,000 to $60,000 on outlying parcels, coastal flood zones add 15% to 25% for elevation and engineer-stamped compliance, and a larger ADU (up to 1,200 sq ft) adds build cost but no extra permit step. For a property-specific quote, call (781) 627-7000.
Plymouth County or Bristol County?
Marion is in Plymouth County, not Bristol County like its neighbors Acushnet and Fairhaven. Deed recordings for Marion go to the Plymouth County Registry of Deeds in Plymouth [Plymouth Deeds]. It is a different deed registry workflow from the Bristol County towns just to the west.
Who do I call about building an ADU in Marion?
For official town process questions (permit requirements, fees, how Section 230-8.14 applies to your lot, Online Permitting help, building code interpretation), call the Marion Building Department at (508) 748-3516 and ask for the Building Commissioner or the Town Planner.
For parcel-level feasibility, cost estimates, design options, watershed and flood considerations, and construction planning, call BuildX at (781) 627-7000.
The two are different conversations. The town can tell you what is administratively required. BuildX can tell you what is realistic on your specific parcel and what it will actually cost to build.
Sources Reviewed
Last verified: November 20, 2026. Grouped by source type so you can see which claims come from town law, state law, town process, local constraints, and media records.
View all 20 sources, grouped
- Town of Marion. Zoning Bylaw, Chapter 230, Section 230-8.14, Protected Use Accessory Dwelling Units. Adopted at the May 2025 Annual Town Meeting (Article 33). ADUs up to 1,200 sq ft or half the principal dwelling, whichever is smaller, by right; districts; one ADU per lot; no separate sale; 31-day minimum lease; parking; sewer and water connection. Ask the Town Clerk for the certified text.
- Commonwealth of Massachusetts. Accessory Dwelling Units (760 CMR 71.00). Protected-use ADUs. The regulation took effect January 31, 2025; the underlying ADU statute (Affordable Homes Act) took effect February 2, 2025.
- Commonwealth of Massachusetts. Accessory Dwelling Unit (ADU) FAQs. State guidance on ADU rules.
- Massachusetts General Laws. M.G.L. Chapter 40A, Section 3. Zoning Act as amended by the Affordable Homes Act (Chapter 150 of the Acts of 2024), ADU provisions.
- MassDEP. Title 5 (310 CMR 15.000) Compliance for ADUs FAQ. Relevant for outlying septic parcels and nitrogen-sensitive coastal areas.
- Massachusetts General Laws. M.G.L. Chapter 131, Section 40. Wetlands Protection Act.
- Town of Marion. Building Department. Marion Town House, 2 Spring Street; (508) 748-3516; Building Commissioner Bob Grillo; hours Monday to Thursday 8:00 AM to 4:30 PM, Friday 8:00 AM to 3:30 PM. Town House terminology, Stormwater Management Bylaw, and scenic road context.
- Town of Marion. Building Permit Information. Permit information; Fire Department burning-permit reference.
- Town of Marion. Conservation Commission and ADU legislation information. Town menu and ADU legislation context.
- Town of Marion. Department of Public Works. Sewer and water capacity review for ADU connections per Section 230-8.14.
- Buzzards Bay Action Committee (BBAC). Contact information. The regional water-quality coalition for the Buzzards Bay watershed; mailing address at the Marion Town House.
- Wikipedia and U.S. Census. Marion, Massachusetts. Population (about 5,000), coastal Plymouth County geography, Sippican Harbor, Tabor Academy, and historic village context.
- Census Reporter. Marion town profile. Demographics.
- Plymouth County Registry of Deeds. Plymouth County Registry of Deeds. Deed registry for Marion (Plymouth County).
- Town of Marion. Conservation Commission. Wetlands Protection Act and local wetlands bylaw filings for waterfront and wetland-adjacent projects. Confirm the current Conservation Commission page and filing requirements with the Marion Town House at (508) 748-3516.
- Town of Marion. Board of Health. Title 5 review and Buzzards Bay watershed and nitrogen-sensitive coastal area coordination. Confirm the current Board of Health page and requirements with the Marion Town House at (508) 748-3516.
- MassGIS, Bureau of Geographic Information. Aquifer and Zone II wellhead protection GIS layers. Aquifer and wellhead protection overlays.
- Federal Emergency Management Agency (FEMA). Flood Map Service Center. Marion coastal flood zone lookup (Sippican Harbor, Buzzards Bay coastline, Mattapoisett Harbor frontage).
- Sippican Week. Marion Mulls Accessory Dwelling Unit Bylaw. October 2024. Coverage of the joint Planning Board and Select Board meeting of October 7, 2024, documenting Building Commissioner Bob Grillo's statement on the old bylaw.
- The Wanderer. Marion Annual Town Meeting results. May 2025. Article 33 (Section 230-8.14, Protected Use ADUs) passed by majority; Article 34 (repeal of the old accessory apartment bylaw) passed unanimously.
Nearby South Coast ADU Rules
Marion borders Wareham to the north and west, Mattapoisett to the east (sharing Mattapoisett Harbor), Rochester to the north, and Acushnet to the west across the county line. All four are home territory for BuildX, the same coastal neighborhoods we build in.
ADU Rules by City in the BuildX Service Area
BuildX serves 40 towns across four areas of southeastern Massachusetts. Each city has its own ADU bylaw, sewer or septic split, overlay map, and Building Department contact. Jump to the rules for your town:
South Shore (22)
South Coast (9)
- Acushnet
- Fairhaven
- Freetown
- Lakeville
- Marion (you are here)
- Mattapoisett
- Middleborough
- Rochester
- Wareham
Bridgewater Area (5)
Thinking about an ADU in Marion?
BuildX can review your Marion parcel for zoning, sewer or septic, FEMA flood zone, Buzzards Bay watershed, wetlands, and aquifer overlay issues before you spend money on design or permitting. Marion is BuildX home territory, so we know the constraints that drive your project, from the coastal flood zones to the 1,200 sq ft by-right allowance.
See our ADU project portfolioDisclaimer: The information on this page is drawn from live interviews, podcast episodes, municipal bylaws, planning board materials, town websites, and other publicly available sources, and reflects what was accurate as of the original recording or verification date. Pricing, timelines, materials, regulations, zoning rules, permit processes, fees, and overlay district boundaries can change -- sometimes without public notice -- and no two towns interpret or apply the rules the same way. This page is for informational purposes only and should not be relied upon as the basis for any purchasing, construction, or investment decision. BuildX makes no guarantee that the information is current or complete for your specific parcel. Before making any decisions, contact the town directly or call BuildX at (781) 627-7000 or schedule a Project Clarity Call to review your specific situation.